This unique system allows the slab formwork to be stripped only three days after concrete has been poured. The double-headed jack allows the support work to remain in place thereby avoiding repropping
Complete slab and support system erected.
Reinforcing steel placed and concrete poured. One day after concreting the second set of support can be erected on the floor above.
After three days deck panels and kwikstrip beams are stripped without removing the support
(A double set of support is supplied).
Features of the kwikstrip system:
- Maximum utilisation of equipment
- Eliminates any deflection of slab
- No repropping required.
- Can be used with coffers and troughs

 |
After stripping level 1 the panels and kwikstrip beams can immediately be placed on the second set of support previously erected on level 2. |
|