slab formwork system, kwikstrip system, building support, south africa

This unique system allows the slab formwork to be stripped only three days after concrete has been poured. The double-headed jack allows the support work to remain in place thereby avoiding repropping

Complete slab and support system erected.

Reinforcing steel placed and concrete poured. One day after concreting the second set of support can be erected on the floor above.

After three days deck panels and kwikstrip beams are stripped without removing the support
(A double set of support is supplied).

Features of the kwikstrip system:

  • Maximum utilisation of equipment
  • Eliminates any deflection of slab
  • No repropping required.
  • Can be used with coffers and troughs

After stripping level 1 the panels and kwikstrip beams can immediately be placed on the second set of support previously erected on level 2.


 

 
Home | Company Profile | Access Scaffoling | Wall Formwork | Slab Formwork and Support | Kwikstrip System | Decking | Cantilevers | Coffers and Troughs | Accessories | Box Floor Centre | Props | Table Systems | Column Boxes | Special Formwork | Sitemap | Construction Equipment | Scaffolding | Building Equipment | Steel Formwork | Deckings | Links |Articles Internet Marketing | SEO